Rm-materials-handling WIRE ROPE PACKAGES Instrukcja Użytkownika Strona 21

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 76
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 20
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
21/76
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
3 Traveling machinery assembly
3.1 Machinery sizes 3-5
Pos. Name Specification Amount
1 End carriage 2
2 Washer DIN125-A8-A3G (Machinery sizes 3 and 4)
DIN6796-A12-A3G (Machinery size 5)
8+8
3 Screw DIN912-M8x85-8.8-A3G (Machinery size 3)
DIN912-M8x100-8.8-A3G (Machinery size 4)
DIN912-M12x140-8.8-A3G (Machinery size 5)
8+8
4 Traveling machinery 2
Clean splines and mounting flanges from dirt and rust protection wax and grease the shaft lightly
before assembly.
You can use a plastic hammer to slide drive in. Do not use any metal or lead hammer.
Tightening torques M8-8.8 23 Nm, M12-8.8 77 Nm.
Remove the protection pin from the breather plug.
Przeglądanie stron 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 75 76

Komentarze do niniejszej Instrukcji

Brak uwag